Gas, Diesel, Dual Fuel Steam Generator

Basic Info

  • Model NO.: FDLSS0.3~FDLSS2.0

  • Fuel: Gas/Oil/Dual Fuel

  • Structure: Water Tube

  • Water Circulation: Natural Circulation

  • Pressure: Low Pressure

  • Burning Style: Cyclone Furnace

  • Capacity: 25bhp~140bhp

  • Rated Steam Output: 300kg/Hr~2000kg/Hr

  • Trademark: Devotion

  • Origin: Jiangsu 

  • Function: Steam Boilers

  • Installation: Packaged Boiler

  • Media: Steam

  • Drum Placement: Vertical Boiler

  • Manufacturing Level: A

  • Usage: Industrial

  • Design Structure: Vertical

  • Applicable Electricity: 3/380/50,3/220/60,3/440/60

  • Specification: 0.3 t/h~2 t/h

  • HS Code: 84021900

Product Description

Boiler Applications
-for plant process where steam demand is not big, e.g textile;
-for laundry,Kitchen, etc where fast steam or frequent steam is requested;

Product Features
-compact packaged design, less installation area;
-water tube structure, quick steam generation;
-burner top mounted installation;
-fine quality insulation materials;
-intelligent boiler controller with multi level protections;
-fully automatic operation;
-applicable fuel: gas, oil


Technical data of vertical steam boiler

Model                                                    DataFDLSS0.3FDLSS0.5FDLSS0.75FDLSS1.0FDLSS1.5FDLSS2.0
Rated steam output(t/h)0.30.50.7511.52
Rated working pre(MPa)0.7/1.0/1.25
Applicable fuelLight oil/Heavy oil/Natural gas/LPG/City gas
Fuel consumptionLight oil(kg/h)20.834.652.168.8104.3137.6
Heavy oil(kg/h)21.335.453.470.4106.8140.9
Natural gas(Nm3/h)25.141.762.882.9125.7165.7
LPG(Nm3/h)8.914.822.329.344.558.7
City gas(Nm3/h)56.293.2140.6185.4281.1370.7
Effciency(%)90.190.590919091
Heating surface(m3)7.810.214.919.827.334.5
Electricity consumption(kW)1.82.52.552.24.86.2
Shipping Weight(t)1.231.631.992.23.713.94
Water volume(m3)0.20.320.480.580.861.01

Q1: What is the Warranty for the boilers?
A1: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier.

Q2: How about the installation and commissioning?
A2: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

Q3: What's the production lead time for delivery?
A3: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

Q4: What about your payment term?
A4: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q5: What kind of documents will be provided?
A5: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

Q6: What's your MOQ?
A6: Only 1 set, if you have more than that, you will get a more favorable price.

Q7: How's the packaging & shipping
A7: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.